It is very important to do a good job in the maintenance and maintenance of large hollow blow molding machines. It is important for improving equipment operation rate, output and product quality, extending equipment overhaul cycles, reducing equipment maintenance costs, and improving enterprise economic benefits. The role of. For large-scale hollow blow molding machines, from the completion of the equipment installation and the start of the test machine, the maintenance of the equipment has begun, and the equipment management system should be formed and formulated as soon as possible, and implemented in the production workshop team and team members to ensure The maintenance work is implemented and a long-term effective management mechanism is formed, so that all the operating records of the equipment in the factory can be checked: it will facilitate future maintenance and replacement work. Judging from the equipment management work system of most blow molding product manufacturers, the establishment of a three-level equipment maintenance system for factories, workshops, and teams is a relatively effective equipment management work system.
It means that it is a maintenance checklist for each shift of a large hollow blow molding machine, and the inspector needs to make a record according to the situation.