1 min read

1) The heater of the plasticizer system must be evenly tightened and the heater and the heating surface should be tightly integrated. For mica heaters, the rubber hammer is used to gently tap the fasteners to ensure tight fit, conducive to heating, extendthe dating life of the heater.

2) The thermocouple probe must have sufficient spring preload to ensure the accuracy of the temperature measurement.

3) The mold head bolts of the storage tank cannot be fully tightened. The cylinder can be pressed gently to give the cylinder room to expand and shrink;

4) Before heating, the cooling water of the cylinder and the cooling water of the die need to be opened to prevent the cylinder feed section blockage, to prevent the aging of the sealing parts and leakage of oil. Cylinders on the gearbox and mold head.

5) The magnetic frame should be placed in the hopper to prevent scrap metal from entering the screw, causing damage to the screw and mold parts or blocking the mold channel.

6) When the freezer starts, it is usually recommended that when the pipe blank stoushed out of the mold, the squeeze speed should be reduced and the speed gradually increased.

7) Before the pipe is usually squeezed out of the mold, the staff should not stand in front of the mold head and mold, in the first 3 lenses of the material tank, the personnel should be far away from the lower part of the mold, manual injection pressure should not be too large (generally not more than 5MPa).

8) The automatic injection pressure of the cylinder is generally not very large, the actual injection time is generally greater than 5 seconds. Too fast can cause wall-thick tracking errors and melt breaks.

9) For machines equipped with wall thickness control system, the wall-thick controller must first be manually started and run, and then start the squeeze to prevent the mold port from being completely closed causing damage to the parts.